以往,數據中心布線的重點是在線的性能上,簡單地綁紮一下就直接上配線架。隨着布線水平的提高,雙絞線的布局美觀度也開始關注,那麼,數據中心怎樣布線既美觀也不影響性能?

數據中心怎樣布線

① 瀑布造型理線

雙絞線直接從配線架的模塊上垂下來,一般每層是24到48根雙絞線,如果分佈比較整齊的時候,有比較強的層次感。

② 逆向理線

從模塊開始向機櫃外理線,同時橋架內也進行理線。一般是在測試後進行的,所以不會出現某根雙絞線測試通不過而造成重新理線的情況,但是這種理線方式也有不足之處,那就是機房內的某一處會出現大量的亂線,一般在機櫃的底部。

③ 正向理線

這種方式也可以叫做前饋型理線,是在配線架端接前進行理線。一般情況下,是從機房的進線口開始,將線纜逐段整理,直到配線架的模塊後端為止。在理線後再進行端接和測試。

* * * * * *

創世服務有限公司是一間提供專業數據中心架設公司,擁有一群專業團隊貼心地關注客戶的要求,並提供優質的服務。

想了解更多關於「數據中心怎樣布線」的內容,請瀏覽創世官網:http://livservices.com.hk

地址: 香港觀塘鴻圖道37-39號鴻泰工業大廈4樓4室

電話:852-31063235

——————

Data center how to wiring

① Waterfall modeling cable management

Twisted pair directly from the patch panel module hanging down, each layer is generally 24 to 48 twisted pair, if the distribution is more neat, there is a strong sense of hierarchy.

② Reverse management

From the module to the cabinet outside the management line, while the cable management within the framework. Generally after the test, so there will not be a single twisted pair test pass caused by re-line case, but there are some disadvantages of this cable management, that is, there will be a large number of machine room The mess line, usually at the bottom of the cabinet.

③ Positive management line

This method can also be called feedforward rationale, is the rationale before patch panel termination. Under normal circumstances, is from the entrance into the engine room, the cable will be organized paragraph by paragraph, until the patch panel module so far. Tail wire and test after wiring.

* * * * * *

LIV is a professional data center to set up a company, with a group of professional team intimate attention to customer requirements, and provide quality services.

For more information about 'Data center how to wiring',please visit : http://livservices.com.hk

Address: Unit 4, 4/F., Hung Tai Industrial Building,37-39 Hung To Road, Kwun Tong, Hong Kong

Tel: +852 3106 3235


聯絡人 : 創世服務有限公司
電 話 : 852-31063235

網上查詢